Partitioning Information and Forms
Site Evaluations Related to Property Partitionings Applicants partitioning property must also, if there is an existing homesite, obtain a review of the existing septic system in addition to the onsite sewage system feasibility study on the proposed lot(s)
Site Evaluation Information How to apply for a Septic Site Evaluation permit, includes information on items needed to submit with the application and the process
Site Evaluation to System Installation Explains the steps involved in obtaining a permit to install an onsite wastewater treatment and disposal system
Existing Septic System Evaluation Report Instructions Required on the parent parcel to establish the system location, size and condition. System is inspected to determine condition and whether the required setbacks from the proposed partitioning lines can be met.
Onsite Sewage Disposal Application The application for site evaluation and/or septic system permits; includes fee information
Residential Site Plan Required as part of the site evaluation and/or septic system permits; must include two for permits related to property partitioning Residential Site Plan Example - An example of a completed site plan
Pumper FormRequired if the existing system is more than five years old
Land Use Compatibility Statement (LUCS) Required for properties in urban growth boundaries, the UT (Urban Transition) Zone, and inside city limit
Test Pits Requirements and diagram
Setbacks Table Shows required distances from septic systems and replacement areas