Name of subdivision or other Development ___________________________________________________________
Review by __________________________ Date ______________________
______ 1. Vicinity Map on Cover Sheet?
______ 2. Title Block?
______ 3. Engineers Stamp and Signature?
______ 4. Streets and Roads?
______ a. Typical Sections?\
______ 1) Pavement?
______ a) AC Class?
______ b) Thickness?
______ c) Width?
______ d) Cross-slope?
______ 2) Aggregate Base?
______ a) Grading (1" - 0, etc. ) ?
______ 3) Turnpike?
______ a) Shoulder?
______ (1) Width. Narrower around cul-de-sac?
______ (2) Cross-slope?
______ b) Ditch?
______(1) Width to C.L.?
______(2) Entering slope?
______(3) Backslope?
______ 4) Curbs?
______ a) Type?
______ b) Height of Exposure?
______ c) Aggregate base underneath?
______ d) Weep holes?
______ 5) Sidewalks?
_____ a) Location (Curb line or property line)?
_____ b) Width?
_____ c) Concrete?
______ b. Profiles?
______ 1) Stationing and scales ( vertical and horizontal ) ?
______ 2) Existing ground at centerline and right-of-way lines?
______ 3) Vertical Alignment?
______ a) Grades: centerline for turnpike, top of curb for curbed section?
______ (1) Maximum?
______ (2) Minimum ( Including cul-de-sac and curb returns ) ?
______ b) Vertical curves?
______ (1) Minimum length?
______ (2) Curve data ( stations and elevations of PIVC, BVC, EVC ) ? ______ c. Plans?
______ 1) North arrow, scale, street centerline, right-of-way lines, stationing, and street names?
______ 2) Horizontal alignment?
______ a) Curves?
______ (1) Minimum radii?
______ (2) Maximum superelevation?
______ (3) Superelevation runoff?
______ (a) Minimum length?
______ (b) Method of obtaining?
______ (c) Shown on profile?
______ (4) Curve data ( radius, length, deflection angle, stations of P.C. and P.T.. ) ?
______ b) Cul-de-sac minimum radii?
______ (1) Entering sac?
______ (2) Around sac?
______ c) Intersections?
______ (1) Sight distances?
______ (2) Angles?
______ (3) Turnpike flare radii?
______ (4) Curb returns?
______ (a) Radii?
______ (b) Wheelchair/bicycle ramps?
______ 3) Slope easements required?
______ 4) Traffic signs and barricades?
______ a) Shown on plans?
______ b) Note specifying that they are to be furnished and installed by Subdivider/developer/contractor?
______ 5) Note specifying that all utilities and utility laterals that will lie under the street must be placed prior to paving of street.
______5. Drainage?
______ a. Drainage basins and receiving facility, swale, stream or body of water shown?
______ b. Hydraulic calculations?
______ 1) Method applicable. Maximum area for rational formula?
______ 2) Parameters and assumptions?
______ c. Detention system required?
______ 1) Hydraulic calculations ( methods, parameters, assumptions ) ?
______ 2) Storage basin capacity?
_____ 3) Method of flow restriction?
______ d. Existing stream or ditch to be piped? Maximum size?
______ e. Provisions for draining adjacent property? ______ f. Pipe?
______ 1) Diameter?
______ 2) Type ( concrete ) ?
______ 3) ASTM type and class?
______ 4) Rubber casket joints in roadway?
______ 5) Crushed rock trench backfill in roadway?
______ g. Open channel?
______ 1) New open channels not allowed in UGB?
______ 2) Typical section?
______ a) Width?
______ b) Depth ( also see profile ) ?
______ c) Side slopes?
______ h. Profile?
______ 1) Existing ground surface?
______ 2) Finished grade of street, ground, etc.?
______ 3) Invert with elevations and slopes?
______ 4) Inlets, cleanouts and manholes?
______ a) Location by station?
______ b) Elevation of inverts and rims?
______ 5) Minimum or maximum cover over pipe?
______ 6) Maximum depth in open channel?
______ i. Plan?
______ 1) Alignment of pipe or ditch with ties to centerline, curb, right-of-way or property lines?
______ 2) Location of inlets, cleanouts and manholes?
______ 3) Curved pipelines?
______ a) Radius
______ b) Maximum joint pull?
______ j. Capacity? Free flow ( not under head ) in pipes?
______ k. Velocity?
______ 1) Minimum for self cleaning?
______ 2) Maximum?
______ a) Thrust blocks on pipe?
______ b) Rip Rap or lining in ditches?
______ l. Inlets?
______ 1) Type?
______ 2) Type of grate?
______ 3) Maximum spacing?
______ 4) Maximum pipe size?
______ 5) At all low points ( including curb returns ) ?
______ 6) Maximum depth of catch basins?
______ m. Cleanouts/junction boxes and/or manholes?
______ 1) Required at:
______ a) Changes in alignment or grade?
______ b) Lateral connections of lateral pipe > ½ diameter of main line?
______ c) Changes in pipe size?
______ d) Maximum cleaning intervals?
______ 2) Manholes required because of pipe size and/or depth?
______ n. Outfalls: Rip or rap or structure to prevent erosion?
______ o. Conflicts with sewers or other utilities?
______ p. Easements over private property?
______ 1) Minimum width?
______ 2) Extra width required by pipe size, depth or special conditions?
______ 3) Access to easement?